Facilities Design & Construction
Active Minor Projects
Project
No.
Project Location/Description
FSU
PM
A/E
CM
NTP-A/E
SCHEDULE/HISTORY
Des. Comp.
Bid/GMP
NTP Const.
Subst. Comp
Updated
12/19/2014
Total $
Funding
Source
BUDGET
Design Fees $
Construction $
31358
31540
31556
31654
31670
31698
31766
31769
31865
AME Pressure Vessel Walkways & Platform
Alumni Village Demolition
Frank Shaw HVAC Replacement
President House - Storage Building
Duxbury Hall ASF Door Replacement
Palm Court Sidewalk
BK Roberts Hall Restroom Renovations
Law Library Collaborative Learning Environments Ph I
UCA Passport Office Renovation
JS
JS
JS
JS
JS
JS
JS
JS
JS
BN
N/A
WA
ALW
FSU/TE
GA
FSU/H2
FSU/H2
FSU/MFE
CH
CH
CH
OR
CBI
CBI
RIP
RIP
SBS
7/19/13
N/A
2/19/13
9/1/14
4/1/14
8/1/14
8/20/14
8/11/14
8/15/14
12/19/13
N/A
10/11/13
10/10/14
6/2/14
10/8/14
11/5/14
10/22/14
10/22/14
7/28/14
1/14/14
11/20/13
11/20/14
9/10/14
11/24/14
11/19/14
11/26/14
11/14/14
9/14/14
2/19/14
5/1/14
12/23/14
10/1/14
12/2/14
12/4/14
12/2/14
11/24/14
12/14/14
1/6/15
2/1/15
1/23/15
4/1/15
1/16/15
2/12/15
2/6/15
1/5/15
10,860
N/A
N/A
19,982
2,500
13,585
7,440
5,990
5,700
166,020
461,651
545,027
127,438
287,837
197,967
202,031
223,582
83,182
176,880
461,651
545,027
147,420
290,337
211,552
209,471
229,572
88,882
FS-254
FS-238A
FS-254
FS-234
CM1431670
FS234
CM1431766
CM1431769
CM1531865
31276
31457
31474
31475
31479
31461
31571
31761
31626
31668
31768
31837
31849
NHMFL - Roof Replacement
Bio One - Demo & Abatement
Kellogg Elevator Upgrade
Fine Arts Elevator Upgrade
Westcott 201-211
NHMFL - AHU Replacement
Sandels 401 Lab
Campus Utilities - 15KV Switch Gear & Cable
ICR - Generator
Eppes - Finishes
FSU Card Center
Sliger Firealarm Replacement
NWRDC - Fire Alarm Replacement
BQ
BQ
BQ
BQ
BQ
BQ
BQ
BQ
BQ
BQ
BQ
BQ
BQ
HN
FSU/MFE
ALW
ALW
FSU/H2
PINN
HN
FSU
MFE
ALW
HN
MFE
MFE
AW
MD
CBI
CBI
RIP
TBD
CH
SBS
AW
CBI
CBI
TBD
TBD
4/28/13
10/1/13
9/6/15
9/6/15
11/1/13
11/20/13
2/5/14
4/1/14
10/15/14
9/1/14
7/25/14
11/25/14
11/25/14
8/29/14
5/1/14
12/5/14
12/5/14
1/15/14
4/29/14
5/29/14
7/11/14
11/6/14
10/1/14
9/15/14
12/20/14
12/20/14
9/29/14
TBD
1/22/15
1/22/15
2/12/14
TBD
6/13/14
7/15/14
12/3/14
11/5/14
10/1/14
TBD
TBD
10/16/14
TBD
2/2/15
2/2/15
5/1/14
TBD
8/4/14
8/5/14
12/11/14
12/5/14
10/15/14
TBD
TBD
3/27/15
TBD
8/1/15
8/1/15
1/20/15
TBD
1/20/15
TBD
1/20/15
4/30/15
12/20/14
TBD
TBD
79,842
65,589
18,775
19,200
27,951
107,406
41,790
N/A
4,500
16,130
32,665
9,367
16,146
1,305,651
1,135,000
320,000
370,000
942,158
1,000,000
529,467
124,206
125,000
687,381
388,205
100,633
123,854
1,385,493
1,200,589
338,775
389,200
970,109
1,107,406
571,257
124,206
129,500
703,511
420,870
110,000
140,000
FS-249
FS-212
FS-249
FS-259
FS-249
FS-212
FS-254
FS-249
CC1431626
FS-251
Dept
FS-234
FS-234
31468
31471
31557
31665
31727
31781
31783
31848
31859
31858
Civic Center Genset
Civic Center SQ D Electrical Switches and breakers
Civic Center Phase III Seating Replacement
Civic Center Back Loading Dock Improvements
Civic Center Seimens Performance Contract
Civic Center West Lobby Entrance Improvements
Civic Center Fire Alarm Upgrades
Civic Center Sound System Replacement
Civic Center Door Hardware/ Curtain Wall
Civic Center Wireless / VOIP / Networking
GF
GF
GF
GF
GF
GF
GF
GF
GF
GF
BFBA
BFBA
BFBA
BFBA
Seimens
BFBA
BFBA
BFBA
BFBA
ITS
CH
CH
CH
CH
Seimens
CH
CH
CH
CH
Sun Coast
11/20/13
4/1/14
12/16/13
8/1/14
5/1/14
9/28/14
9/1/14
8/27/14
8/15/14
9/15/14
3/15/14
4/25/14
6/1/14
N/A
3/18/14
4/15/14
9/15/14
TBD
8/1/14
NA
3/30/15
5/7/15
1/23/15
2/25/15
10/24/14 11/1/14
9/15/14 10/28/14
10/1/14 10/10/14
5/15/14
6/1/15
4/30/14
TBD
9/4/14
6/1/15
4/1/15
12/1/14
12/1/14
10/17/14
3/15/15
6/15/15
2/1/15
TBD
4/16/15
11/2/15
7/15/15
1/30/15
3/15/15
1/30/15
170,000
NA
115,000
34,016
NA
12,300
37,535
78,534
35,285
N/A
2,007,000
613,000
3,537,200
265,984
NA
1,237,700
362,465
800,000
364,000
278,325
2,177,000
613,000
3,652,200
300,000
1,769,328
1,250,000
400,000
878,534
399,285
278,325
FS-253
FS-253
FS-253
FS-253
31733
31545
Commonwealth FGS Renovatiion
Keen Plaza Renovation
BC
BC
MLD
HN
RIP
AW
6/18/14
6/15/14
9/18/14
11/1/14
10/8/14
12/20/14
11/20/14
1/15/15
2/20/15
4/1/15
31,240
40,216
318,760
509,784
350,000
550,000
FS-249
FS-249
31671
UCD Renovations - Phase 2
BA
GRC
CH
5/1/14
5/13/14
5/20/14
TBD
TBD
58,855
650,000
708,855
FS-270A
31636
Dirac Starbucks
Dirac-Dittmer Site
Thagard Plaza Improvements
Kursteiner-Housewright Plaza Improvements
KB
KB
KB
KB
ALW
ALW
GA
FSU
RIP
RIP
TBD
MD
2/24/14
7/16/14
8/15/14
TBD
7/1/14
2/1/15
TBD
TBD
7/3/14
TBD
TBD
TBD
9/22/14
TBD
TBD
TBD
12/22/14
TBD
TBD
TBD
52,673
47,586
14,082
TBD
511,366
TBD
TBD
TBD
564,039
CM1431636
Civic Center Locker Room Improvements
BL
BFBA
CH
10/8/14
11/25/14
3/15/15
4/1/15
10/15/15
41,200
208,800
250,000
31813
31780
Total
Key
A/E = Architect/Engineer
CM = Construction Management
N/A = Non-Applicable
TBD = To Be Determined
GMP = Guaranteed Maximum Price
NTP = Notice To Proceed
DB = Design Build
FSU PM (Project Manager) Abbreviations
A/E's
ALW = Architects: Lewis & Whitlock
GA = George & Associates
MLD = Manausa Lewis Dodson
PINN = Pinnacle Eng.
BN = Bliss & Nyitray
HN = Hicks Nation
IC = Inovia Consulting
REI = Rosenbaum Engineering, Inc.
MBC = Moore Bass Consulting, Inc.
MA = Moses & Associates
1,273,940
FS-253
FS-253
FS-253
FS-253
FS-253
550,000
TBD
FS-253
21,110,674 24,642,274
PEG = Performance Engineering Group
H2 = H2 Engineering
AE = Affiliated Engineering
GRC = Gilchrist, Ross & Crowe Architects
WA = Walker Architects
1/--pages
Пожаловаться на содержимое документа